Category | Item | Cost (per unit) | Unit | Notes/Description | Links | |
---|---|---|---|---|---|---|
1 | Module | JINKO 390 | $0.00 | ea | Mono Perc Half-Cell Panel + 25/25 Year WNTY. JKM390M-72HBL-V | |
2 | Module | QCELL 410 | $0.15 | watt | Triple Black Half-Cell Panel + 25/25 Year WNTY. Q.PEAK DUO BLK ML-G10+ 410 | |
3 | Module | JINKO 425 | $0.10 | watt | Mono Perc Half-Cell Panel + 25/30 Year WNTY. | |
4 | Module | JINKO 470 | $0.15 | watt | Mono Facial Half-Cell Panel + 25 Year WNTY. JKM470M-7RL3-TV | |
5 | Module | QCELL 480 | $0.00 | watt | Bifacial Half-Cell Panel SLV/WH + 25 year WNTY. Q.PEAK DUO XL-G10.3/BFG 480 | |
6 | Module | QCELL 585 | $0.15 | watt | Bifacial Half-Cell Panel SLV + 25 year WNTY. Q.PEAK DUO XL-G11S.3/BFG 585 | |
7 | Inverter | Enphase IQ8+ | $0.00 | watt | Enphase IQ8+ Microinverter w/ 295W Continuous AC | |
8 | Inverter | Enphase IQ8M | $0.15 | watt | Enphase IQ8M Microinverter w/ 325W Continuous AC | |
9 | Inverter Custom | Avalon ESS 11.4kW 29.4kWh | $25,500.00 | ea | Avalon Whole-Home ESS, Smart Energy Panel w/ integrated 200A transfer switch, whole home hybrid 11.4kW inverter, BMS, and 29.4kWh (4.9kWh X 6 battery modules) 25-year Warranty, plus Meter Upgrade (if applicable) | |
10 | Inverter Custom | Avalon ESS (x2) 11.4kW 49kWh | $35,800.00 | ea | Avalon Whole-Home ESS, Smart Energy Panel w/ integrated 200A transfer switch, 2 whole home hybrid 11.4kW inverters, BMS, and 49kWh (4.9kWh X 10 battery modules) 25-year Warranty, plus Meter Upgrade (if applicable) | |
11 | Storage | Enphase 5P (w/Solar) | $20,300.00 | ea | 2 Enphase 5P Batteries w/Solar for Whole House Back-Up w/ IQ Controller 3 w/ Gen. Integration (Load & appliances analysis needed) 1 extra Enphase Battery needed for Whole-Home Back-Up, plus Meter Upgrade (if applicable) | |
12 | Storage | Enphase 5P (Add-on) | $3,500.00 | ea | 1 Enphase 5P Battery for Whole Home Back-Up for IQ Controller 3 or IQ Controller 3 w/ Gen. Integration | |
13 | Storage | Enphase 5P (w/o/Solar) | $22,300.00 | ea | 2 Enphase 5P Batteries | Storage requested out of the loan/lease contract for Whole House Back-Up w/ IQ Controller 3 w/ Gen. Integration (Load & appliances analysis needed) 1 extra Enphase Battery needed for Whole-Home Back-Up, plus Meter Upgrade (if applicable) | |
14 | Storage | Enphase 5P (Add-on) | $5,500.00 | ea | Enphase 5P Battery | Additional Battery requested out of the loan/lease contract for Whole-Home Back-up | |
15 | Generator | Generac Generator | $11,500.00 | ea | Generator w/ Pad & Transfer Switch | Available sizes 20kW, 22kW, 24kW. Size assessed upon request. | |
16 | System | Micro System | $2,000.00 | ea | Micro Systems Under or Equal to 5.00kW | |
17 | System | Small System | $1,200.00 | ea | Small Systems Under or Equal to 6.00kW | |
18 | System | Ground Mount >10 | $0.30 | watt | Ironridge or Equivalent Ground Mount Over 10kW | |
18 | System | Ironridge Ground <10 | $0.35 | watt | Ironridge or Equivalent Ground Mount Under 10kW | |
19 | Racking | Sunmodo Contour System | $25.00 | ft | Custom Design Luxury Trim | |
20 | AHJ | St Louis County, MO | $600.00 | ea | Building Permit Process, Inspections, and Requirements from the County | |
21 | AHJ | City of Columbia, IL | $1,000.00 | ea | Inspections and Installations Requirements from the City | |
22 | AHJ | Kansas City Structural | $350.00 | ea | Kansas City (KS & MO) Structural Assessment | |
23 | Roof | Special Roof Material | $0.07 | watt | Metal, Tile, Flat, S-Type, Slate, Clay | |
24 | Roof | Re-Roof | Quote | ea | Partial and Full Re-Roofs | |
25 | Roof | Three Story | $1,500.00 | ea | Homes with Three or More Stories | |
26 | Roof | 9/12 Pitch or Higher | $0.15 | watt | Steep Roofs from 9/12 on | |
27 | Service Panel | Relocate MSP | Quote | ea | Relocate Main Service Panel | |
28 | Service Panel | Relocate Meter | Quote | ea | Relocate Meter | |
29 | Service Panel | 100 Amp MPR | $4,500.00 | ea | 100 Amp MSP (Main Service Panel) Main Panel Replacement | |
30 | Service Panel | 200 Amp MPR | $4,800.00 | ea | 200/225 Amp MSP (Main Service Panel) Main Panel Replacement | |
31 | Service Panel | 200 Amp MU/MR | $3,800.00 | ea | 200 Amp Meter Upgrade/Replacement | |
32 | Service Panel | 100 Amp MPR & 200 Amp MU/MR | $6,000.00 | ea | 100 Amp Main Panel Replacement & 100/200 Amp Meter Upgrade/Replacement | |
33 | Service Panel | 100 Amp MPU to 200 Amp & 200 MU/MR | $7,000.00 | ea | 100 Amp Main Panel Upgrade to a 200 Amp Main Panel & 200 Meter Upgrade/Replacement | |
34 | Service Panel | 200 Amp MPR & 200 Amp MU/MR | $7,000.00 | ea | 200 Amp Main Panel Replacement & 200 Amp Meter Upgrade/Replacement | |
35 | Service Panel | Sub Panel Swap | $800.00 | ea | Add or Relocate a Subpanel | |
36 | Service Panel | Service Panel Clean-up | $1,200.00 | ea | Clean-up and Wiring Sorting Inside Service Panel | |
37 | Electrical | External Tap Box Install | $2,700.00 | ea | External Tap Box Installation | |
38 | Trenching | Dirt - Under 20ft Ground Mount or Roof Mount | $500.00 | ea | Dirt Trenching Under 20ft Flat Fee | |
39 | Trenching | Dirt - 21 to 100 ft Ground Mount or Roof Mount | $1700.00 | ea | Dirt Trenching Between 21-100 ft | |
40 | Trenching | Dirt - 101 to 200 ft Ground Mount or Roof Mount | $20.00 | ft | Dirt Trenching Between 101-200 ft - Price per foot | |
41 | Trenching | Dirt - Above 200 ft Ground Mount or Roof Mount | $Quote | ea | Dirt Trenching Above 200 ft - Quote | |
42 | Trenching | Concrete - Under 15 ft Ground Mount or Roof Mount | $950.00 | ea | Cut Concrete for Trench Under 15 ft | |
43 | Trenching | Concrete - 16 ft or longer Ground Mount or Roof Mount | Quote | ea | Cut Concrete for Trench 16 ft or longer | |
44 | Trenching | Concrete - Return to Original | Quote | ea | Cut and Trench For Conduit Plus New Concrete | |
45 | Site Survey | Local Site Survey 0-60 Miles | $150.00 | ea | Local Site Surveys 0-60 Miles from Hub Location | |
46 | Site Survey | Travel Site Survey Over 60 Miles | $250.00 | ea | Travel Site Surveys Over 60 Miles from Hub Location | |
47 | Travel | Travel Time (MO, IL & KS) | $600.00 | ea | Travel from 100 to 200 Miles from Hub (St Charles, MO or Peoria, IL) | |
48 | Travel | Travel Time (MO, IL & KS) | $1,200.00 | ea | Travel from 200 to 300 Miles from Hub (St Charles, MO or Peoria, IL) | |
49 | Travel | Travel Time (MO, IL & KS) | $2,500.00 | ea | Travel Over 300 Miles from Hub (St Charles, MO or Peoria, IL) | |
50 | Travel | MPU/MPR Reschedule Truck Roll | $1000 | ea | Customer doesn’t show up or isn't’ available for work | |
51 | Travel | Installation Reschedule Truck Roll | $750 | ea | Customer doesn’t show up or isn't’ available for work | |
52 | SREC | SREC Bond Fee | Varies | ea | Held Upfront for Illinois Shines Program | |
53 | SREC | SREC Filing Fee | Varies | ea | Disclosure Filing Fee | |
54 | Other | Tree Trimming or Removal - Subject to increase if need be based on quote | $3,000.00 | ea | Tree Trimming or Removal by Third Party Company | |
55 | Other | Tree Trimming Admin | $200.00 | ea | Tree Trimming or Removal fee for Admin and Procedures Coordination within Helio | |
56 | Administration | Change Order | $500.00 | ea | Change Order After Plan Submittal | |
57 | Administration | Stage 1 Cancellation | $75.00 | ea | Cancellation after Site Survey – All Cancel Costs are Accumulative. | |
58 | Administration | Stage 2 Cancellation | $150.00 | ea | Cancellation after Engineering Submission – All Cancel Costs are Accumulative. | |
59 | Administration | Stage 3 Cancellation | $150.00 | ea | Cancellation after Permit Submission – All Cancel Costs are Accumulative. | |
60 | Administration | Stage 4 Cancellation | $150.00 | ea | Cancellation after NEM Submission – All Cancel Costs are Accumulative. | |
61 | Administration | Stage 5 Cancellation | $250.00 | ea | Cancel after Purchase Order – All Cancel Costs are Accumulative. | |
62 | Administration | Stage 6 Cancellation | $750.00 | ea | Cancellation at Truck Roll – All Cancel Costs are Accumulative. |